Skip to content

Design and Professional Installation of Structured Cabling Systems (SCS)

We create an impeccable physical foundation for the digital infrastructure of offices, business centers, warehouses, and production facilities. From the development of the working project and hidden cabling of the twisted pair (Cat 5e/6/6A) to the welding of fiber optic master lines, server rack cabling, and hardware certification of each line.

✓ Compliance with international standards TIA/EIA-568 and ISO/IEC 11801
✓ Copper links (Cat 5e, 6, 6A) and splicing of high-speed fibre routes (Single-Mode / Multi-Mode)
✓ Hardware testing of each line with certified analyzers (Fluke Networks)
✓ Ideal port labeling, patch panels, and detailed execution documentation
SCS Cat 5e / 6 / 6A Fiber Optic Splicing Certification Fluke Networks Installation of server racks Network warranty
ALL IT • SERVICE SPEC
SLA 99.9%
[ NETWORK ADMINISTRATION ] WARRANTY UNDER AGREEMENT
Patching log and structured cabling port connection diagram

RJ-45 ports installed: 144. Optical fusion splices: 24. Successful Fluke tests (Pass): 100%.

⏱ Start: 1–3 days 🛡️ NDA: 100% SLA Warranty
🔌
Cat 6 & Optics
Throughput 10 Gbps
✅
Fluke Certified
100% test of each link
📑
Marking 1:1
Clear Schema in Cabinet
🛡️
Reliability
Long-Term Warranty
✓ Official contract with fixed cost of work
✓ 100% transfer of rights to code and configuration to the customer
✓ Assigned leading engineer and support 90 days
FULL TRANSFER OF RIGHTS CONTRACT + WARRANTY
[ FOUNDATION OF RELIABILITY ]

Why quality structured cabling installation is a one-time investment lasting decades

About 70% corporate network failures are caused by poor cable termination and makeshift installation

[ 01 ]

Complete absence of sudden internet outages

Professionally laid cable in a conduit, troughs or cable channels is protected from accidental damage by chair legs, cleaners or rodents.

[ 02 ]

Stable speed 1–10 Gbit/s without packet loss

The correct cable bend radius, adherence to the twist pitch on sockets, and protection against electromagnetic induction of power cables ensure stable speed.

[ 03 ]

Ease of scaling and troubleshooting

Thanks to clear labeling and cross-reference journal, the system administrator connects a new work station within 30 seconds without calling installers.

[ 04 ]

Fire safety and protection from smoke

We use only high-quality copper cable with a non-flammable LSZH (Low Smoke Zero Halogen) sheath, complying with DBN standards and office safety standards.

[ENGINEERING SCHEDULE FOR INSTALLATION]

What is included in professional cabling network construction

Full cycle of works from agreement of design plan to final cleaning of building dust

[ STEP 01 ] Structured cabling design

Pre-project site visit and cable project development

We calculate cable routes, drop heights, prepare passive equipment specifications and switching scheme.

[ STEP 02 ] Cable Channels

Installation of load-bearing systems: troughs, boxes, floor plates

We install metal mesh troughs under the suspended ceiling, neat plastic boxes, or mount floor access panels near desks.

[ STEP 03 ] Cable laying

Installation of copper and optical communication lines

We pull out the twisted pair (UTP/FTP Cat 5e/6/6A) and optical cables without twists with length reserve for moving workstations.

[ STEP 04 ] Outlet termination

Installation and termination of outlets, patch panels, and keystone jacks

We install RJ-45 modules into employee outlets and carefully split cables on patch panels in the server cabinet according to the T568B standard.

[ STEP 05 ] Server Cabinet

Collection of switching racks and optical boxes (ODF)

Collecting 19-inch cabinets, installing cable organizers, welding optical fibers and laying out pigtails into splice trays.

[ STEP 06 ] Certification

Fluke hardware certification and execution documentation

We test each link to the category, generate a graphical test report, and send the marked network scheme to the client.

[ RATE PACKS ]

Choose the scale of the cabling system for your room

Fixed price per port, transparent material cost estimate, and long-term warranty

For small rooms up to 200 m²

Network of the office (up to 30 workstations)

Quick and neat installation of Cat 5e/6 cable network for PCs, phones and printers with connection to wall cabinet.

Development time: from 3–5 working days
Work Scope:
✓ Installation of up to 40 information lines in pairs
✓ Installation of Wall or Floor Outlets RJ-45
✓ Collection of wall-mounted 19" communication rack (9U–12U)
✓ Patch panel and cable management
✓ Basic testing of each line for integrity and disconnection
✓ Port marking and 3 years of full warranty on installation
Most Popular Format for Modern Open-Space (up to 600 m²) ★ Popular

Corporate Structured Cabling Pro (30–100 workstations)

Full-scale structured Cat 6 (1–10 Gbps) network: floor access panels, cable trays, floor mount and certification.

Development time: from 5–10 working days
Work Scope:
✓ Everything that is included in the package «Network of the office»
✓ Installation of up to 120 Cat 6 structured cabling ports (supporting 10 Gbps)
✓ Mounting of metal grooved troughs under the ceiling
✓ Installation and cabling of a rack server (24U–42U)
✓ Connection of lines for Wi-Fi access points and IP cameras
✓ Hardware testing with Fluke Networks analyzer and graph printing
✓ Complete network implementation plan and 5 years of official warranty
For business centers, warehouses, multi-level buildings, and factories

Enterprise Complex / Fiber (from 100 ports)

Large low-voltage project: optical interfloor trunk lines, hundreds of workstations, integration with access control system and video surveillance.

Development time: from 2–4 weeks
Work Scope:
✓ Everything included in the «Corporate SCS Pro» package
✓ Installation from 150+ ports of Cat 6A / Cat 7 with shielding
✓ Splicing of interfloor optical lines (Single-Mode / Multi-Mode)
✓ Installation of intermediate switching cross-connections (IDF) and central (MDF)
✓ Comprehensive integration with video surveillance lines, access control system and fire safety
✓ Official certification of the cabling system with warranty up to 15 years
← Swipe options →
[ ONLINE CALCULATION ]

Calculate the approximate cost of SCS installation

Select the number of workstations and cable type for preliminary budget calculation

1. Category of twisted pair and type of environment: Select Variant

2. Total number of working ports (RJ-45): Select Variant

3. Conditions for laying routes within the premises: Select Variant

CHOOSEN PARAMETERS OF THE SOLUTION:
⏱ Estimated Timeline: Calculation... 👥 Team: 2–3 engineers
1. Category of twisted pair and type of environment: Cat 5e UTP (Gigabit standard, 1 Gbps to 100 meters)
2. Total number of working ports (RJ-45): Up to 30 ports (15–20 workstations + printers)
3. Conditions for laying routes within the premises: Under a Suspended Ceiling (Armstrong / Grillo / Open Concrete)
✓ Parameters will be fixed in the application form
Get an exact quote
[ STAGES OF COOPERATION ]

How the project is delivered

Transparent process from first contact to final release on your domain.

01
1 Day

Field engineer visit to the location and measurement of dimensions

We inspect the object, check obstacles, determine the location of the server rack and prepare a detailed tracing scheme.

02
1–2 days

Approval of project, specifications, and budget

We provide a transparent estimate with exact cable length, junction box, socket and conduit measurements, and fix the terms in the contract.

03
2–5 days

Installation of troughs, boxes and cable securing

We install cable structures and lay out twisted pair with compliance to technological bend radii.

04
1–3 days

Socket termination and installation of patch panels and a server cabinet

Carefully disassemble the keystones at workstations, assemble the server rack, and organize the cable ties.

05
1 Day

Testing of Fluke lines, labeling and handover

We check each port with a device by category, apply durable labels, and deliver the network execution passport.

Our Clients

Companies that have entrusted ALL IT Agency with the development and scaling of their digital solutions

DIM Service
Valikhnovski Surgery Institute
Wizeclub
Partner Case 5
Partner Enterprise
Partner Case 6
TOV Zagin Alpha
Meregi Group
Partner Case 11
DIM Service
Valikhnovski Surgery Institute
Wizeclub
Partner Case 5
Partner Enterprise
Partner Case 6
TOV Zagin Alpha
Meregi Group
Partner Case 11
[ FREQUENT QUESTIONS ]

Answers to common questions from customers

Key details regarding terms, independent website editing, and rights transfer.

Cat 5e cable is designed for frequencies up to 100 MHz and guarantees a speed of up to 1 Gbit/s over a distance of up to 100 meters. Cat 6 operates at frequencies up to 250 MHz, has an internal plastic separator for pairs, is significantly less susceptible to crosstalk and is capable of transmitting data at a speed of 10 Gbit/s (up to 55 meters), which creates a significant margin for growth of the company's network for the next 10–15 years.

It is not recommended to completely do away with cables for system business. First of all, the Wi-Fi access points themselves require a high-speed cable connection to get internet and PoE power. Second, stationary PCs, IP phones, servers, network printers, and video surveillance systems work one order more stably with zero delays precisely through the physical cable.

According to corporate engineering standards, it is recommended to install a minimum of 2 RJ-45 ports per desk: one for a computer or laptop, another for an IP phone or backup (for example, connecting a local network printer or a second monitor with a docking station).

A simple Chinese tester shows only whether the contacts match from 1 to 8. A professional cable analyzer Fluke measures physical signal parameters: cable length, resistance, attenuation, crosstalk (NEXT/FEXT) and return loss. This gives 100% guarantee that the line actually corresponds to the declared category and will withstand the required speed.

Yes. We provide an official warranty on the quality of installation works from 3 to 5 years, and when using certified components from leading manufacturers (Corning, Molex, Panduit, R&M) — a system warranty on the cabling infrastructure up to 15 years.

Share this service with partners or colleagues

Fast delivery to the working chat or copying the link for budget approval

Planning to install a cable network in a new office or warehouse?

Describe the number of workstations and the area of the object. Our main SCSS engineer will conduct a free on-site visit for measurements and prepare a project cost estimate.

Confidentiality

Official NDA contract for system audit

Quick Feedback

We will contact you within 15 minutes during business hours.

Order a calculation for the installation of the structured cabling system

The tech lead will contact you within 15 minutes during working hours