Load testing and stress testing of web platforms, APIs, and databases
Find the exact capacity limit of your infrastructure before real customers test it during promotions or TV advertising. We simulate from 1 000 to 100 000+ concurrent users with Locust, k6, and Apache JMeter. We find slow SQL queries, memory locks, and server bottlenecks.
Virtual users: 25,000 • RPS: 4,200 • Average response time: 84ms • Errors: 0.00%
How much does the business cost due to unknown system limits?
Load testing turns the fear of a sale into mathematically accurate confidence
Confidence in Conducting Large-Scale Campaigns
You definitely know how many people the site can handle at the same time, when bloggers publish ads or a mailing starts.
Preventing "drop" of databases during checkout
Detecting situations of row-level mutual blocking (Deadlocks) in databases during mass ordering of the same product.
Cost savings on server resources
Tests show which servers are actually needed, and where you rent extra capacity out of fear of failure.
Verification of Recovery After Failures (Spike Testing)
We check if the system is able to recover on its own after a sudden 10-fold traffic surge without admin involvement.
What is included in the comprehensive performance audit under load
System infrastructure check using 4 classical load models
Design of Load Model (Workload Model)
We analyze historical Google Analytics data, create realistic buyer behavior profiles (view percentage, cart, and payment).
Development of Test Scenarios (Locust / k6)
We are writing user action simulation scripts: randomization of pauses between actions (Think Time), unique authentication data and carts.
Basic Performance Testing (Baseline Load Test)
We provide normal expected load for fixing basic indicators of page response time and CPU consumption.
Stress testing for failure (Stress / Breaking Point)
We gradually increase the load step by step, until the system starts returning errors, accurately determining the stability threshold.
Durability testing (Soak / Endurance Test)
We maintain a moderate stable load for 6–12 hours to detect hidden memory leaks and disk fullness.
Report and step-by-step recommendations for optimization
We provide a detailed engineering report with delay charts, list of slow SQL queries, and instructions for developers.
Test execution packages
Choose the test scale accordingly to the planned peak traffic
Calculate the cost of load testing
Select the expected traffic volume and the number of test scenarios
1. Target number of concurrent users: Select Variant
2. Load Object: Select Variant
3. Required types of tests: Select Variant
How the project is delivered
Transparent process from first contact to final release on your domain.
Our Clients
Companies that have entrusted ALL IT Agency with the development and scaling of their digital solutions
Answers to common questions from customers
Key details regarding terms, independent website editing, and rights transfer.
Would you like to find out the real strength limit of your system?
Describe the expected traffic and server configuration. Our lead load testing engineer will develop a testing plan within 24 hours.
Confidentiality
Official NDA contract for system audit
Quick Feedback
We will contact you within 15 minutes during business hours.
Order load testing
The tech lead will contact you within 15 minutes during working hours