Skip to content

Smooth migration of server infrastructure and databases to the cloud

Protect your business from physical risks, blackouts, and removal of equipment. We migrate local servers, corporate 1C/ERP databases, file storage, and terminal workstations to reliable European Tier III+ data centers (Hetzner, AWS, Azure, De Novo) with a guarantee of uninterrupted business processes.

✓ Migration with zero downtime business (Zero Downtime) through parallel data replication
✓ Physical security: your servers and confidential databases are reliably located in EU data centers
✓ Full disk encryption (LUKS / BitLocker) with the possibility of emergency access blocking
✓ Cloud cost optimization: we select exact configurations without overpaying for excess gigabytes
Zero-Downtime Migration Data Center Tier III+ (EU) Hetzner / AWS / Azure Disk Encryption Protection against seizure
ALL IT • SERVICE SPEC
SLA 99.9%
[ SYSTEM ADMINISTRATION ] WARRANTY UNDER AGREEMENT
Synchronization of Local Server ➔ Cloud Hetzner (Germany)

Data transferred: 4.8 TB. Replication status: 100% In-Sync. Network latency (Ping): 22 ms.

⏱ Start: 1–3 days 🛡️ NDA: 100% SLA Warranty
☁️
Clouds EU
Germany, Finland, Poland
⚡
Zero Downtime
Parallel Transition
🛡️
Anti-Raiders
Physical inaccessibility
🔐
Cryptographic Protection
Encryption LUKS/BitLocker
✓ Official contract with fixed cost of work
✓ 100% transfer of rights to code and configuration to the customer
✓ Assigned leading engineer and support 90 days
FULL TRANSFER OF RIGHTS CONTRACT + WARRANTY
[ SECURITY AND RESILIENCE OF BUSINESS ]

Why Modern Ukrainian Business is Massively Migrating to European Clouds

Cloud deployment is the main insurance of the company against force majeure and military threats

[ 01 ]

Absolute Protection Against Physical Removal or Destruction

Local office server can be deleted, damaged in pieces or flooded. Server in Germany or Finland data center is under reliable protection of European law.

[ 02 ]

100% Independence from Blackouts and Office Internet

Tier III Data Centers are equipped with industrial diesel generators and dozens of independent optical channels, guaranteeing uptime 99.99% under any conditions.

[ 03 ]

Flexible resource scaling in a few minutes

You no longer need to wait weeks for delivery of new memory sticks or disks: adding 32 GB RAM or 2 TB SSD to the server can be done with one click in the panel.

[ 04 ]

Emergency 'red button' access blocking

We configure special scenarios for immediate disconnection of remote sessions and decryption of encrypted disks by the business owner's command.

[SCHEDULE OF UNINTERRUPTED MIGRATION]

Step-by-step engineering plan for infrastructure migration

No file loss or workday interruptions — the entire transition is carried out unnoticed for employees

[ STEP 01 ] Audit

Audit of local infrastructure and load profiling

Extracting real metrics of CPU, RAM, disk operations IOPS consumption and calculating optimal cloud configuration without overpaying.

[ STEP 02 ] Provider

Choosing a Data Center and Deploying the Target Environment

Selecting a provider (Hetzner, AWS, De Novo, Azure), renting servers, installing hypervisor and configuring disk encryption.

[ STEP 03 ] Network Tunnel

Construction of a secure communication tunnel (VPN / GRE)

We create a fast encrypted communication channel between your office and the cloud data center based on WireGuard or IPsec.

[ STEP 04 ] Replication

Background data replication and image synchronization

We are transferring the main file array in the background directly during the workday using incremental rsync / ZFS-send protocols.

[ STEP 05 ] Testing

Test launch in the cloud and user verification

Key personnel and managers check the work of accounting systems in the cloud without interrupting the main database operation.

[ STEP 06 ] Cutover & Launch

Night switch (Cutover) and handover to key

At night we synchronize the latest changes of the day, switch workstations to the cloud, and in the morning employees start work in the new system.

[FORMATS OF MIGRATION PROJECTS]

Choose a migration package under the scale of your business

Fixed budget for key work and written warranty for data preservation in the contract

For small business with 1–2 servers

Migration 'Basic Server / 1C'

Fast, secure migration of an accounting server (1C / BAS) or file storage to the reliable European Hetzner cloud.

Development time: from 3–5 working days
Work Scope:
✓ Audit of the current configuration and server selection in Hetzner
✓ Deployment of Virtual Server and Disk Encryption
✓ Configuration of secure VPN connection from the office
✓ Seamless Migration of Database and User Files
✓ Setup daily automatic backups
✓ 14 Days of Free Support After Deployment
Most popular format for medium-sized companies ★ Popular

Comprehensive Infrastructure Pro

Full office server infrastructure transfer: Active Directory, RDP terminals, SQL databases, telephony and email.

Development time: from 7–14 working days
Work Scope:
✓ Everything that is included in the package 'Basic Server'
✓ Migration to 5 virtual machines or complex cluster
✓ Storage of all user accounts and GPOs for Active Directory domain
✓ Configuration of terminal RDP farm for dozens of employees
✓ Connection of Zabbix 24/7 monitoring and alerting
✓ 'Red button' for emergency server disconnection for owner
✓ 30 days of engineering support and SLA schedule
For large companies, banks and holding groups

Enterprise Cloud Migration

Large-scale migration to public hyperscalers (AWS, Azure, Google Cloud) or building a private hybrid cloud with georeservation.

Development time: from 3–6 weeks
Work Scope:
✓ Everything that is included in the package 'Infrastructure Pro'
✓ Migration of tens of servers and databases with terabytes of data
✓ Construction of a geographically distributed cluster in two different EU countries
✓ Infrastructure as Code (Terraform / Ansible) for full system description
✓ Compliance with the requirements of banking secrecy and the ISO 27001 standard
✓ Dedicated Cloud Architect and round-the-clock support for the first reporting period
← Swipe options →
[ ONLINE CALCULATION ]

Calculate the parameters of migrating your infrastructure to the cloud

Select the current state of your systems to develop an engineering plan and migration budget

1. Number of servers and data volume to migrate: Select Variant

2. Desired cloud provider and data center location: Select Variant

3. Allowed technical downtime (Maintenance Window): Select Variant

CHOOSEN PARAMETERS OF THE SOLUTION:
⏱ Estimated Timeline: Calculation... 👥 Team: 2–3 engineers
1. Number of servers and data volume to migrate: 1 server (1C/BAS database + files up to 500 GB)
2. Desired cloud provider and data center location: Hetzner Cloud / Dedicated (Germany, Finland)
3. Allowed technical downtime (Maintenance Window): Weekend days (Saturday-Sunday)
✓ Parameters will be fixed in the application form
Get an exact quote
[ STAGES OF COOPERATION ]

How the project is delivered

Transparent process from first contact to final release on your domain.

01
1–2 days

Systems engineering audit and budget calculation for the cloud

We determine exact requirements for processors, RAM, and storage, select the most cost-effective provider tariff without overpaying.

02
1–3 days

Deployment of cloud platforms and secure tunnels

We rent instances in Germany data centers, configure disk encryption, and connect an encrypted VPN gateway to your office.

03
2–5 days

Background data migration without interrupting employees' work

Synchronizing files and databases in real-time in the background. Your team continues to work on the old server without restrictions.

04
1–2 days

Test launch and verification of functionality

Accounting and managers access the cloud copy, check the report generation speed and calculation accuracy.

05
1 night

Final nighttime switch and start of work

We transfer the latest changes from the evening, update the icons on the work desks, and in the morning employees work in a safe cloud.

Our Clients

Companies that have entrusted ALL IT Agency with the development and scaling of their digital solutions

Partner Enterprise
TOV Zagin Alpha
DIM Service
Meregi Group
Partner Case 11
Partner Case 6
Wizeclub
Valikhnovski Surgery Institute
Partner Case 5
Partner Enterprise
TOV Zagin Alpha
DIM Service
Meregi Group
Partner Case 11
Partner Case 6
Wizeclub
Valikhnovski Surgery Institute
Partner Case 5
[ FREQUENT QUESTIONS ]

Answers to common questions from customers

Key details regarding terms, independent website editing, and rights transfer.

No, quite the opposite. Thanks to the use of high-speed NVMe enterprise-class disks and direct fiber-optic connections from Ukrainian backbone providers to Frankfurt and Helsinki, network latency (Ping) is only 20–35 milliseconds, which is completely imperceptible to the human eye. Moreover, working through a remote desktop (RDP) does not depend at all on the client's file loading speed.

No. The main data array (terabytes of files and images) is transmitted through a secure channel in the background mode, while your employees are working. The migration to the cloud is scheduled during non-working hours (night or weekends), when only a small delta of changes from the last day is transmitted.

Servers in the cloud will continue to operate without any disruptions. Employees can connect to their workstations via mobile internet (4G/5G), Starlink or from home using home computers and laptops, without losing any minute of working time.

All disks in the cloud are encrypted using the AES-256 algorithm (LUKS on Linux or BitLocker on Windows). Access to servers is provided exclusively through personal VPN keys with two-factor authentication. Even data center administrators cannot physically read your files.

The cost of a cloud server at Hetzner is on average from €15 to €60 per month for a powerful virtual machine (4–8 CPU cores, 16–32 GB RAM, fast NVMe disk), which is significantly cheaper than purchasing and annual maintenance of a physical server in the office.

Share this service with partners or colleagues

Fast delivery to the working chat or copying the link for budget approval

Do you want to protect your business and safely migrate to the cloud?

Describe the number of servers and the current size of the databases. Our leading cloud architect will develop a seamless migration plan and calculate the cloud cost.

Confidentiality

Official NDA contract for system audit

Quick Feedback

We will contact you within 15 minutes during business hours.

Order migration to the cloud

The tech lead will contact you within 15 minutes during working hours